The Construction Process

What is the construction process of the MORE PARKtm System?

The modular grid is bolted together into frames, and then precast decks are dropped into place and affixed to the steel structure. The decks are sloped to predetermined drainage patterns and a PVC water collection system is attached and plumbed into your existing storm water management system.

A ramp is attached, stairs and rails are erected, the façade is attached around the perimeter and lighting is installed.

Once the MORE PARKtm System is installed, striping takes place and signage and parking controls are installed.

You are now ready to collect parking revenue, a few short weeks after erection began.