Stone Bridge Iron and Steel

Sustainability and MORE PARK

The MORE PARKtm System and a commitment to sustainability.

The MORE PARKtm System is an environmentally friendly approach to coping with your increased parking requirements. Built from steel with a recycled content of over 95% (LEED-NC v2.1 80+% “post-consumer”, 15+% “post-industrial”), the MORE PARKtm System is the most environmentally responsible means to provide additional parking.

It is the least disruptive means to build a parking structure to the local environment available on the market today.

Additionally, the MORE PARKtm System is the most carbon-friendly approach to constructing a parking facility, and it is deployed in hundreds of locations throughout Europe as a result.

Compare the negative impact to the local environment of having several huge pieces of construction equipment, hundreds of truck deliveries, and dozens of construction workers driving to work each day for 6-18 months while a cast-in-place garage is built.

By comparison we only have the trucking involved in the transport of the fabricated steel and concrete to site and a few weeks of installation with a small crew and a few small pieces of equipment – it’s an easy environmental decision.

Below are a few links to articles outlining the contributions both steel and precast make to the LEED (Leadership in Energy and Environmental Design) Green Building Rating System.

Steel, the most recycled material in the world

The Green Side of Precast Construction

Precast Concrete Contributions to LEED Certification

Building Green with Concrete

For additional information click here: morepark.com